yep, goes in monday, comes out on wednesday. having the front bumper done cos the muppet that last had it tried to blow in 1 corner after a scrape which looks...very beginer like in its finishand 2 small rust areas, one on the drivers door and one on the rear door, total area of one square inch. so it'll look the muts for billing, shame i wont be getting the wheels though
i still aint got my rta money yet so it'll have to be the minimum done for the show. also have to re wire the video and ps2 as the 15" is takin up so much in height of the boot the video had to be removed. i also need to get the brake disc's into a machine shop as they have warped so i'll get the warp skimmed out of them (i hate that when it happens to new disc's) especially at 120 notes for the fronts
![]()
so who else is leaving it til the last minute for the show and what r u getting done?
gav.




LinkBack URL
About LinkBacks
and 2 small rust areas, one on the drivers door and one on the rear door, total area of one square inch. so it'll look the muts for billing, shame i wont be getting the wheels though
i still aint got my rta money yet so it'll have to be the minimum done for the show. also have to re wire the video and ps2 as the 15" is takin up so much in height of the boot the video had to be removed. i also need to get the brake disc's into a machine shop as they have warped so i'll get the warp skimmed out of them (i hate that when it happens to new disc's) especially at 120 notes for the fronts
Reply With Quote
will be nice to put a face to a name and swop ideas like
or two of course, the nations finest truth serum lmao the more u drink....the more bo**cks u talk
) he got charged 80 or 90 quid cant remember exactly the price but cheap and good finish....cant go wrong. if its local have a scoot around, if i'm passing (not on a call cos its difficult to write a numer down doin 50+ 