well work started yesterday with the refit and the removal of a few walls to free up some space in the shop
all works being done by ourselfs as with some advice from friends in trade
we got the orignal site plans and lifted floor boards to see what was load bearing and whats not
on the search we found the bathroom beams to be sitting on the wall we wanted to take down but as we are only wanting to move the wall back by roughly 1.2 meters we can use a 6x2 frame to support it and tie the ends in to the bedroom beams
we have planned to have it all done by 10th of april (while the shop remains open threw it)
ill let the pics do the talking
inside the shop before the refit (walls being removed )
work in the store room
first thing to be removed was the old door frame
frame up
the rest of the wall removed back to the frame
(the 2 doors you see in the pic are being removed aswell
the wall/fireplace on the left is being removed aswell (thankfully for us the last owners removed it up stairs and in the attic so makes our job a hell of a lot easier lol)
and how we left it last night
got a new floor and suspended celing coming and a new fridge got a new lay out for the shop aswell
ill update tonight with todays progress
thanks gilly